-
Figure 1.
Operation of a unidirectional URT line.
-
Figure 2.
All-stop and skip-stop plan. (a) All-stop, (b) skip-stop.
-
Figure 3.
Passenger arrival distribution.
-
Figure 4.
Optimization results of evaluation indicators for each plan.
-
Figure 5.
Distribution of waiting density by scenario. (a) Plan A, (b) Plan B1, and (c) Plan B2.
-
Figure 6.
Train timetable for Plan B2.
-
Figure 7.
Sensitivity analysis of maximum number of skipped stations.
-
Parameters Meanings I Set of stations, I = {1, 2, 3, ..., N} I' Set of skipped stations, $ \ I' \subset I $ K Set of trains, K = {1, 2, 3, ..., |K|} i Station index, $ \forall i \in I $ j Skipped station index, $ \forall j \in I' $ k Train index, $ \forall k \in K $ ak,i Arrival time of train k at station i dk,i Departure time of train k from station i λk,i Number of waiting passengers at station i when train k arrives $ \lambda'_{k,i} $ Number of waiting passengers at station i when train k departs ηk,i Actual number of passengers on train k upon its arrival at station i $ f_{k,i}^a $ Number of passengers alighting from train k at station i $ f_{k,i}^b $ Number of passengers boarding train k at station i hmin Minimum safe headway ρk,i Passenger density at station i when train k arrives at station i $ \rho'_{k,i} $ Passenger density at station i when train k departs from station i Wk,i Total waiting time when train k arrives at station i $ {\bar \rho '_j} $ Average waiting density for each train leaving station j D Train stopping time Si Platform area of station i C Train rated capacity Nmax Maximum number of skipped stations ri Passenger arrival rates at station i rk,i Proportion of passengers alighting from train k at station i ni Initial number of waiting passengers at station i ti Train running time between station i and i+1 tmin Minimum headway tmax Maximum headway Evaluation indicators $ \bar t $ Average train operation time q Total stop density during operation $ {\tilde \rho '_j} $ Density variance of waiting passengers when each train depart from station j β Passenger carrying capacity per second during the operation W Average waiting time during operation Table 1.
Parameters and symbols.
-
Parameters Value ti [158.00, 112.00, 158.10, 109.00, 145.00, 92.00, 121.00, 114.00, 109.10, 105.00, 164.00, 125.00, 146.00, 138.00, 107.00, 132.00] ni [2209, 239, 368, 1865, 699, 208, 64, 114, 119, 52, 93, 118, 834, 96, 99, 80, 0] ri [3.209, 0.797, 1.228, 2.408, 2.331, 0.694, 0.214, 0.381, 0.397, 0.173, 0.309, 0.392, 0.667, 0.318, 0.330, 0.268, 0.000] rk,i [0.000, 0.110, 0.120, 0.130, 0.140, 0.116, 0.192, 0.163, 0.125, 0.064, 0.199, 0.194, 0.522, 0.312, 0.224, 0.266, 1.000] Table 2.
Parameter settings.
-
Stopping mode Plan Objective function Weight settings All-stop A − − Skip-stop Without considering station crowding balance B1 Eqns (1), (2) ω1 = 0.01, ω2 = 0.01, ω3 = 0.98 Considering station crowding balance B2 Eqns (2), (3) ω1 = 0.01, ω2 = 0.01, ω3 = 0.98, ω4 = 0.01, ω5 = 0.99, j = 5 Table 3.
Optimize plans settings.
-
Train Station 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1 1 1 1 0 1 1 1 1 1 1 1 1 0 1 0 1 1 2 1 1 1 1 1 1 1 0 0 1 0 1 1 1 1 1 1 3 1 1 1 1 1 1 0 1 0 1 1 1 1 1 0 1 1 4 0 1 1 1 1 1 1 1 1 0 1 0 1 0 1 1 1 5 1 1 1 1 1 0 1 1 1 1 1 1 1 0 0 1 1 6 0 1 1 0 1 0 0 1 1 1 1 1 1 1 1 1 1 7 1 1 1 1 0 1 1 0 1 1 1 1 1 1 1 1 1 8 0 1 1 1 1 1 1 1 1 1 1 0 1 1 0 1 1 9 0 1 0 1 1 1 1 1 1 1 1 1 1 0 1 1 1 10 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Table 4.
Decision-making variables for Plan B2.
-
Adjacent train number 1−2 2−3 3−4 4−5 5−6 6−7 7−8 8−9 9−10 Departure interval (s) 151 128 131 93 164 149 149 150 142 Table 5.
Departure headways variables for Plan B2.
Figures
(7)
Tables
(5)