Figures (5)  Tables (5)
    • Figure 1. 

      Schematic diagram of the process of improving the auction algorithm based on greedy thinking.

    • Figure 2. 

      Simulation diagram of drone deployment.

    • Figure 3. 

      Schematic diagram of task location. (a) An improved auction algorithm based on greedy thought. (b) Auction algorithm based on time series.

    • Figure 4. 

      Number of UAVs performing monitoring tasks.

    • Figure 5. 

      Number of drones used.

    • Input: $ S $ (drone information set), $ P $ (bidder set), $ T $ (auction item set), $ k $ (total number of tasks)
      Output: $ L $ (Collection of task allocation results)
      $ Flag \gets True $
      while $ Flag $ do
       Random(Task)
       Add tasks to $ T $ and sort them by task urgency and task generation order
       for $ j = 0 $ to $ \text{len}(T) $ do
        if the bidder meets the bidding requirements and the corresponding task number is the original value then
         Add bidders to $ P $
        end if
       end for
       for $ i = 0 $ to $ \text{len}(P) $ do
        if there are no bidders in $ P $ then
         Combine multiple bidders to meet the conditions and join $ P $ if the conditions are met
        end if
       end for
       while $ T $ is not empty do
        Start quoting for competitor products
        Calculate the optimal return for this round
        Calculate the suboptimal earnings for this round
        Calculate the next round of quotation
        if there is a unique highest price then
         The task assignment has been completed, and the bidder information will be added to $ L $
         Remove bidder information from the bidder collection
         Mark Task as in execution status
        end if
       end while
       if $ \text{len}(T) \gt k $ then
        $ Flag \gets false $
       end if
      end while
      return $ L $

      Table 1. 

      IAA-GI.

    • ParameterPrice
      Simulation area1,000 * 1,000 (m)
      Number of drones10/20/30/40/50 (frames)
      Initial speed of drone3 m/s
      End position(600,600,600)
      The maximum number of times a task is executed50
      Average velocity100 km/h
      Agent model size1/2/3/4/5/6 (m)
      Opportunity loss factor0.5
      Delayed penalty factor0.2

      Table 1. 

      Simulation parameters of the city defender.

    • Number of tasks Improved multidimensional PSO[11] Multi-strategy GWO[13] Fireworks algorithm[17] Proposed method
      1,000 56.6 ± 3.2 56.1 ± 2.3 52.8 ± 1.5 88.2 ± 1.4
      2,000 58.9 ± 2.6 58.8 ± 1.7 55.0 ± 4.0 89.0 ± 2.3
      3,000 62.1 ± 3.0 61.0 ± 2.4 59.6 ± 3.2 92.1 ± 2.8
      4,000 65.8 ± 1.8 63.6 ± 3.4 60.2 ± 2.1 94.6 ± 3.9
      5,000 66.9 ± 4.1 67.9 ± 3.1 62.5 ± 2.5 96.2 ± 1.2
      6,000 69.2 ± 2.8 68.4 ± 4.5 65.1 ± 3.6 99.8 ± 1.9
      All values are presented as mean ± SD over 10 repeated runs.

      Table 2. 

      Comparison of resource utilization results.

    • Number of tasks Improved multidimensional PSO[11] Multi-strategy GWO[13] Fireworks algorithm[17] Proposed method
      1,000 12.6 ± 0.3 16.2 ± 0.9 19.1 ± 0.2 0.1 ± 0.5
      2,000 28.5 ± 0.5 28.5 ± 0.7 36.9 ± 0.3 0.6 ± 0.3
      3,000 38.1 ± 0.4 39.0 ± 0.5 58.2 ± 0.5 1.2 ± 0.6
      4,000 56.9 ± 0.3 48.1 ± 0.7 86.2 ± 0.3 2.5 ± 0.5
      5,000 69.8 ± 0.2 82.2 ± 0.6 153.8 ± 0.6 3.2 ± 0.4
      6,000 98.3 ± 0.4 126.9 ± 0.4 186.0 ± 0.5 3.9 ± 0.3
      All values are presented as mean ± SD over 10 repeated runs.

      Table 3. 

      Comparison of task allocation time results.

    • Method Resource utilization (%) Task allocation time (s)
      IAA-GI (full) 99.8 ± 1.9 3.9 ± 0.3
      IAA-GI w/o Greedy 91.3 ± 2.6 5.6 ± 0.4
      IAA-GI w/o Subgroup 74.5 ± 3.1 4.2 ± 0.3
      IAA-GI w/o Value-Sharing 95.2 ± 2.4 4.1 ± 0.4

      Table 4. 

      Ablation results of the components of IAA-Gl (task volume = 6,000).