| [1] |
Hu Y, Li S, Wang Y, Zhang H, Wei Y, et al. 2023. Robust metro train scheduling integrated with skip-stop pattern and passenger flow control strategy under uncertain passenger demands. Computers & Operations Research 151:106116 doi: 10.1016/j.cor.2022.106116 |
| [2] |
Yin J, Tang T, Yang L, Gao Z, Ran B. 2016. Energy-efficient metro train rescheduling with uncertain time-variant passenger demands: An approximate dynamic programming approach. Transportation Research Part B: Methodological 91:178−210 doi: 10.1016/j.trb.2016.05.009 |
| [3] |
Abdelhafiez EA, Salama MR, Shalaby MA. 2017. Minimizing passenger travel time in URT system adopting skip-stop strategy. Journal of Rail Transport Planning & Management 7(4):277−90 doi: 10.1016/j.jrtpm.2017.11.001 |
| [4] |
Chen Z, Li X, Zhou X. 2019. Operational design for shuttle systems with modular vehicles under oversaturated traffic: Discrete modeling method. Transportation Research Part B: Methodological 122:1−19 doi: 10.1016/j.trb.2019.01.015 |
| [5] |
Parbo J, Nielsen OA, Prato CG. 2018. Reducing passengers' travel time by optimising stopping patterns in a large-scale network: a case-study in the Copenhagen Region. Transportation Research Part A: Policy and Practice 113:197−212 doi: 10.1016/j.tra.2018.04.012 |
| [6] |
Niu H, Zhou X, Gao R. 2015. Train scheduling for minimizing passenger waiting time with time-dependent demand and skip-stop patterns: Nonlinear integer programming models with linear constraints. Transportation Research Part B: Methodological 76:117−35 doi: 10.1016/j.trb.2015.03.004 |
| [7] |
Oliveira RCN, Zhang Z. 2024. A conceptual non-stop operation strategy for urban rail transit: a case study of São Paulo's monorail line. Smart and Resilient Transportation 6(1):32−49 doi: 10.1108/SRT-09-2023-0006 |
| [8] |
Xu X, Li CL, Xu Z. 2021. Train timetabling with stop-skipping, passenger flow, and platform choice considerations. Transportation Research Part B: Methodological 150:52−74 doi: 10.1016/j.trb.2021.06.001 |
| [9] |
Motvallian Naeini H, Shafahi Y, SafariTaherkhani M. 2022. Optimizing and synchronizing timetable in an urban subway network with stop-skip strategy. Journal of Rail Transport Planning & Management 22:100301 doi: 10.1016/j.jrtpm.2022.100301 |
| [10] |
Zhao S, Yang H, Wu Y. 2021. An integrated approach of train scheduling and rolling stock circulation with skip-stopping pattern for urban rail transit lines. Transportation Research Part C: Emerging Technologies 128:103170 doi: 10.1016/j.trc.2021.103170 |
| [11] |
Dong X, Li D, Yin Y, Ding S, Cao Z. 2020. Integrated optimization of train stop planning and timetabling for commuter railways with an extended adaptive large neighborhood search metaheuristic approach. Transportation Research Part C: Emerging Technologies 117:102681 doi: 10.1016/j.trc.2020.102681 |
| [12] |
Shao J, Xu Y, Sun L, Kong D, Lu H. 2022. Equity-oriented integrated optimization of train timetable and stop plans for suburban railways system. Computers & Industrial Engineering 173:108721 doi: 10.1016/j.cie.2022.108721 |
| [13] |
Wu Y, Yang H, Zhao S, Shang P. 2021. Mitigating unfairness in urban rail transit operation: a mixed-integer linear programming approach. Transportation Research Part B: Methodological 149:418−42 doi: 10.1016/j.trb.2021.04.014 |
| [14] |
Shang P, Li R, Liu Z, Yang L, Wang Y. 2018. Equity-oriented skip-stopping schedule optimization in an oversaturated urban rail transit network. Transportation Research Part C: Emerging Technologies 89:321−43 doi: 10.1016/j.trc.2018.02.016 |
| [15] |
Ma Z, Yang X, Shang W, Wu J, Sun H. 2024. Resilience analysis of an urban rail transit for the passenger travel service. Transportation Research Part D: Transport and Environment 128:104085 doi: 10.1016/j.trd.2024.104085 |
| [16] |
Cao Z, (Avi) Ceder A. 2019. Autonomous shuttle bus service timetabling and vehicle scheduling using skip-stop tactic. Transportation Research Part C: Emerging Technologies 102:370−95 doi: 10.1016/j.trc.2019.03.018 |
| [17] |
Yuan F, Sun H, Kang L, Lv Y, Yang X, et al. 2023. An integrated optimization approach for passenger flow control strategy and metro train scheduling considering skip-stop patterns in special situations. Applied Mathematical Modelling 118:412−436 doi: 10.1016/j.apm.2023.01.034 |
| [18] |
Farrando R, Farhi N, Christoforou Z, Urban A. 2024. A mathematical model for a two-service skip-stop policy with demand-dependent dwell times. Journal of Rail Transport Planning & Management 31:100461 doi: 10.1016/j.jrtpm.2024.100461 |
| [19] |
Shang P, Li R, Yang L. 2016. Optimization of urban single-line metro timetable for total passenger travel time under dynamic passenger demand. Procedia Engineering 137:151−60 doi: 10.1016/j.proeng.2016.01.245 |
| [20] |
Barrena E, Canca D, Coelho LC, Laporte G. 2014. Exact formulations and algorithm for the train timetabling problem with dynamic demand. Computers & Operations Research 44:66−74 doi: 10.1016/j.cor.2013.11.003 |
| [21] |
Chen Z, Li S, D'Ariano A, Yang L. 2022. Real-time optimization for train regulation and stop-skipping adjustment strategy of urban rail transit lines. Omega 110:102631 doi: 10.1016/j.omega.2022.102631 |
| [22] |
Jamili A, Pourseyed Aghaee M. 2015. Robust stop-skipping patterns in urban railway operations under traffic alteration situation. Transportation Research Part C: Emerging Technologies 61:63−74 doi: 10.1016/j.trc.2015.09.013 |
| [23] |
Chen Z, D'Ariano A, Li S, Tessitore ML, Yang L. 2024. Robust dynamic train regulation integrated with stop-skipping strategy in urban rail networks: An outer approximation based solution method. Omega 128:103135 doi: 10.1016/j.omega.2024.103135 |
| [24] |
Yuan Y, Li S, Liu R, Yang L, Gao Z. 2023. Decomposition and approximate dynamic programming approach to optimization of train timetable and skip-stop plan for metro networks. Transportation Research Part C: Emerging Technologies 157:104393 doi: 10.1016/j.trc.2023.104393 |
| [25] |
Zhang T, Li D, Qiao Y. 2018. Comprehensive optimization of urban rail transit timetable by minimizing total travel times under time-dependent passenger demand and congested conditions. Applied Mathematical Modelling 58:421−46 doi: 10.1016/j.apm.2018.02.013 |
| [26] |
Shi J, Yang L, Yang J, Gao Z. 2018. Service-oriented train timetabling with collaborative passenger flow control on an oversaturated metro line: An integer linear optimization approach. Transportation Research Part B: Methodological 110:26−59 doi: 10.1016/j.trb.2018.02.003 |
| [27] |
Zhang Y, Li S, Yuan Y, Zhang J, Yang L. 2024. Approximate dynamic programming approach to efficient metro train timetabling and passenger flow control strategy with stop-skipping. Engineering Applications of Artificial Intelligence 127:107393 doi: 10.1016/j.engappai.2023.107393 |